Skip to main content

 

ARD27

As a result of our company and product performance for the E-3 mission displays the Boeing AEW program office contacted Argon about the display monitor update for the E-7 Wedgetail program. This program required a larger display at 27” diagonal. Argon responded with a design which met the exact requirements of the updated console. In addition, Boeing was considering placing the monitor in additional new locations on the aircraft, which would require the unit supporting very high vibration levels. Argon rose to the challenge and provided a unit which meet all the requirements and could provide this enhanced capability using a single configuration, rather than two. The ARD27 has been fully qualified for airborne applications and is in full production and in consideration for other airborne C4I or AEW applications.